1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On August 4, 2022 at approximately 9:00am, LPA Haderer arrived unannounced for an annual inspection for Health and Safety. Present for the inspection today was the site director Jessica Miller, teacher Kavitha Viswanathan, 6 parents and 14 children in care. The facility operates as a parent co-op. Hours of operation are 9:00am to 3:30pm
The facility is operated on the west side of Oliveira elementary school, completely independent with a perimeter fence and private opening gates/doors to the facility. It is a single classroom building with a classroom, office, kitchen, children’s bathroom and a separate bathroom/storage area for the adults. The child’s bathroom has 2 toilets and 2 hand washing sinks. Sinks have functioning water taps with appropriate hand washing signs. There are enough towels and soap supplies. All toilets, handwashing and cleaning areas are in safe and sanitary operating condition.
The facility has a large outside play area with areas for play and a sturdy play structure. All are in safe condition and free from sharp, loose or pointed parts and the areas around or under high climbing equipment has appropriate cushioned material that absorbs a fall. Shade is available under the newly built shade structure attached to the south side of the building over the patio area. Teachers and parents are always present.
All documents required to be posted were appropriately posted on the walls: License; Emergency Disaster Plan; Earthquake Preparedness checklist; Notification of Parents Rights; Personal rights; Child seatbelt laws; menus; daily activity schedules. There are no waivers for this facility.
The facility has a two fully charged fire extinguishers, a 3A40BC mounted on the wall of the classroom and a 2A10BC mounted on the wall in the kitchen. The last annual inspections were done 8/04/2021. There is a working carbon monoxide and smoke detectors (both tested and working). Disaster drills are conducted at least once every 6 months. The last drill was completed on June 13, 2022. |