25 | ***Due to COVID-19 pandemic, the following visit was done via televisit***
On 12/14/2020 at 1:00pm, Licensing Program Analyst (LPA) Jonathan Williams met with facility Director, Aparna Parashar, for an announced case management inspection. This inspection was conducted via televisit using the "Facetime" video conferencing application. Present for this visit was the Director, one teacher, one teacher aide, and four children in care. The backyard was toured at 1:05pm.
The Director has installed a play structure in the outdoor play area. The structure was installed by the company Playcraft Systems. The structure consists of a slide, 2-section "tri-ring hub", "revolution hourglass panel", "tri-step jungle traverse", "crawl tube w/ view ports", "revolution bell panel", four "tri pads", and "split lunar climber". The structure was observed at 1:15pm to have poured rubber underneath it to cushion falls and LPA observed the structure to be firmly anchored to the ground throughout the inspection. LPA observed the structure to match the sketch provided by the Director.
LPA reminded the Director that all further additions or changes to the facility, including outdoor play structures, must be approved by the Department before use by children. LPA reminded the Director that all play structures must be age-appropriate and kept in working order at all times.
There are no deficiencies cited today. This report shall remain on file for 3 years. Appeal Rights provided. Exit interview conducted at 1:55pm. |