1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Redmond, conducted a health and safety inspection at the facility. The purpose of the inspection is to ensure the facility is in compliance with Title 22, CCR and Health and Safety Code Statutes for Child Care Centers. During the inspection, LPA met with Cassandra Campbell, Director.
During the physical inspection of the facility, LPA made the following observations:
The Child Care Center site is licensed for a combination center including infant/toddler and preschool aged children. There classrooms are separate according to age. There are three buildings with multiple classrooms in each building.
Capacity/Staffing: LPA observed that the facility is in compliance with capacity limitations, child ratios and staffing levels.
Required Postings: LPA verified the following documents are posted: Facility License, Emergency Disaster Plan, Emergency Disaster Drills, Notification of Parent's Rights, Earthquake Preparedness Checklist. If You See Something, Say Something.
Sign In/Sign Out: Parents use a manual sign in procedure.
Classrooms: Furniture and equipment age appropriate and in good repair. Adequate heating, lighting and ventilation. There is separate storage for children’s belongings. There are cots for each of the children.
Safe Sleep Requirements for Infants: LPA discussed new, 2019 safe sleep requirements with staff. - CONTINUED |