25 | On 03/23/2022, Licensing Program Analyst (LPA), Melissa Guirit conducted an unannounced inspection to measure the new play yard to be used for children. Previously, LPA Sutton conducted an inspection to look at the yard for completion. The facility will utilize the new play yard and the sectioned parking lot that was previously measured by LPM Dyson. The measurements for the new play yard are as follows:
OUTDOORS: 7,174.99 sq feet = 95 children
The facility may now use the new play yard when ready and no waiver is needed for the outdoor play yard. Exit interview conducted with Adrienne Smith and Crystal Smith and a copy of the report provided. |