1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On this date 11/12/2024, Licensing Program Analyst (LPA) Nohemi Sanchez met with Director Mariana Andrade for an unannounced case management inspection to inspect changes that were made to the outside play yard for the toddler component. Currently, Director has added a new Poured-In-Place Rubber to the toddler outside play yard. LPA observed safe and age-appropriate toys and play equipment including a small toddler slide structure. LPA observed the (PIP) provided adequate cushioning underneath the slide structure. LPA observed a large shade structure providing shade to the entire infant play yard. The entire toddler play yard is sectioned off from the older children's play yard by fencing that is over 5 feet height. The outside play yard is cleared for use for the children, effective today 11/12/2024.
There are no deficiencies observed during today’s inspection.
Exit interview conducted with Director, notice of site visit was provided and should be posted for 30 days.
End of Report.
|