1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | The staff rest-room located in the PS classroom, the bathroom is marked as Staff Bathroom and also designated as the isolation bathroom. LPA observed Staff and Children's the bathrooms to be clean and sanitary, with soap, toilet paper and paper towels readily available. Toilets and sinks are functioning properly and age appropriate
*Snack/lunch menus, Allergy list were reviewed and posted. Food and snacks were reviewed for availability, quantity, proper storage, and appropriateness to children in care. Food preparation areas were toured for safety, cleanliness and proper equipment. *Disinfectants, cleaning solutions, poisons and other items that are dangerous or hazardous were inaccessible to children and stored in bathroom in a high cabinet.
*All flooring was found to be clean and safe (Director states carpets and floors were cleaned everyday by a contracted cleaning company. Parent board has all the required forms and fire/disaster drills are current.
*LPA observed fully charged Fire extinguishers throughout the center and hard wired smoke detectors and carbon monoxide detectors were tested and in operable condition.
*Trash cans/storage containers for solid waste had tight-fitting covers that are kept on, and in good repair.
*First Aid supplies were inventoried, a review of medication policy, including administering, labeling, and storage.
*Telephone service, heating, lighting and ventilation were evaluated.
*Outdoor area and equipment was inspected for safety, cushioning material, good repair and age appropriateness, LPAs noted shade, and drinking water: There are no bodies of water on the premises.
*Isolation area is located in the front office and the Staff bathroom the children get to use the adjacent staff staff bathrooms.
|