1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | There are 2 bathrooms; located between Room #1 &2 and between Room #3 & 4.
The bathroom between Rooms #1 & 2 has 2 toilets/2 sinks/and a changing table. 30
The bathroom between Rooms #3 &4 has 4 toilets/ 4 sinks/ and a changing table. 60
Total space with bathrooms will be 90
LPA's also observed each classroom has fully stocked first aid kits. operable carbon monoxide detectors, fire extinguishers, and age appropriate toys and materials. Parent boards contained required forms, staff are aware of the new Safe Sleep Regulations.
The play yard designated for Infants/Toddlers needs the following: The rubber matting underneath the play equipment is deteriorated on the edges which could result in potential fall or injuries. LPAs also observed two tree trunks on the west end of the playground which has left sizable holes in the asphalt. Licensee stated they have received estimates for cost of repair and is in the process of replacing the rubber matting, removing the tree trunks, and filling cracks in walkways. Staff will need a waiver to allow the Infants/Toddlers use the play yards located on the PS side until the play yard designated for Infants/Toddlers is completed.
Fire clearance has been received for the requested capacity of 52 (26 infants and 26 Toddlers). LPA's also observed emergency evacuation cribs as required by the fire department. Exit interview was conducted, copy of reports left at facility with Celia Cassio, Early Learning Supervisor . |