1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On Thursday, August 12th, 2021, at 1:31pm, Licensing Program Analyst (LPA) Blake Morillas and Licensing Program Manager (LPM) Keven Peters met with the Administrator, Paige Roodhouse, and Director, Rachael Shaw Marshal, for the purpose of an Annual Required inspection. No children were present due to the program being closed for the summer.
The first day of school is scheduled to be August 23rd with operating hours to be 8:15am to 2:50pm, Monday through Friday, and will follow the local school calendar.
At 1:36pm, LPA initiated a health and safety inspection of all indoor areas accessible to children.
Previous to the inspection, the Administrator submitted plans to modify the rooms it uses for Child Care. The facility will no longer be using Upstairs Rooms 1, 3, and the Activity Space. They will continue to use Upstairs classroom 2, the bathroom, and adding Downstairs Classroom 1 and a downstairs bathroom with three toilets and 2 sinks. A Fire Clearance inspection has been completed and received by the Regional Office. The inside areas accessible to children have been remeasured and equal approximately 1,144 sq. ft., which is sufficient to maintain their licensed capacity of 30 children. The outdoor area will remain the same.
LPA observed that hazardous items (disinfectants, cleaning solutions etc.) were inaccessible to children in care.
LPA reviewed care and supervision of children, staffing ratios, health related services (including medications and first aid supplies), furniture, equipment, and fire drills logs. LPA observed all required forms to be posted. Sign/in-sign/out sheet were reviewed. Drinking water will be provided via water bottles to children in care.
*Continued on LIC 809-C |