1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 05/18/22 at 12:41 p.m., Licensing Program Analyst (LPA), Rajani Goudreau arrived at the facility to conduct a case management – licensee Initiated inspection. Upon arrival LPA, met with the Director, Veronica Dayag and proceeded to tour the facility. There were 26 napping children in care with two staff members present. The facility is requesting a capacity increase of 100 preschool children, ages 2 years old through kindergarten and a building change under the current licensed address. The daycare building is located near the parish hall in the back-parking lot of the church. Facility operates Monday through Friday from 7:00 a.m. to 5:30 p.m.
Classrooms #1, #2, #3, #4, Art Studio and Stem Lab were inspected and measured a total of 4,581.64 square feet which is sufficient to accommodate 130 children. However, facility is only requesting a capacity of 100 children. Classrooms are equipped with appropriate furniture, napping equipment, including cots, tables, chairs, cubbies, bookshelves, and other materials for the children. The facility has a total of eight toilets and eight sinks exclusive for the children's use, which is sufficient to accommodate the requested capacity. There is a total of three restrooms (one restroom located near the parish building and two restrooms located in the Stem Lab). LPA informed the director children shall be be escorted and supervised by staff members to and from the restrooms and direct visual observation is required at all times. Drinking water is available indoors and outdoors through the use of refillable water pitchers and cups brought from home or provided by the facility. The office and the staff restroom located in the office is designed for ill children, if needed. There is a carbon monoxide detector in the facility and a first aid kit with required supplies. Disinfectants, cleaning solutions, and other hazardous substances are kept inaccessible to the children in care. Required documents are posted in the office. There is an empty water fountain located outside near the office space. Director stated, the fountain will be utilized as a garden for the children. See LIC809-C continuation page… |