25 | On November 13, 2023, Licensing Program Analysts (LPA)Tso met with site Administrator, Jennifer Fan. The purpose of inspection was explained and was for an unannounced, case management inspection for the Action Level Exceedance (ALE) of Lead in Child Care Center's water. LPA was given a tour of the facility. Present in the facility was a site administrator and 4 staff supervising 17 children.
LPA discussed the new Assembly Bill (AB) 2370, Chapter 676, Statutes of 2018 requires the Lead Testing of water in the Child Care Center with the site director during the inspection. All Child Care Centers that are located in buildings constructed before January 1, 2010, must have their water tested and post the results by January 1, 2023, and every 5 years after the date of the first testing.
The facility received the ALE report from the Vendor on October 17, 2023. Test results for this facility that exceeded a higher level of parts per billion (ppb) allowed, 5.5 ppb. The facility was proactive in getting facility faucets tested and barricaded and or made the affected fixture out of order. The affected fixture is, fixture A (56.9) and per administrator, the affected faucet was replaced on October 26, 2023.
The affected fixture A, were scheduled retest on November 30, 2023. Per the updated guidance on written directives in PIN 21-21.1-CCP, facility will be cited for the actionable level exceedance of the fixtures.
LPA obtained copies of the External Water Sampler Self-Certification Form (LIC9275), Child Care Center Sampling Checklist (LIC9276), Facility Sketch (LIC999), have been sent to the department by email.
* See next page for deficiencies cited today
This report was reviewed and signed by site Administrator, Jennifer Fan.