1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On September 29, 2022 at 10:30 AM, Licensing Program Analyst (LPA) Cowan met with site director, Eva Tong, for a 1 Year Required Inspection. Purpose of the inspection was explained. Present, in the facility are director, 2 staff, and 5 children in care. Facility is operating within its capacity, and facility is in compliance with staff / child ratio on this day. Facility operates day-care Monday to Friday from 09:00 AM to 12:00 PM.
With director, LPA inspected the day care rooms and play yard. LPA observed the facility has smoke detector, carbon monoxide detector, fully charged fire extinguisher, and working telephone on site. All cleaning solutions, poisons and other chemicals dangerous to the children are stored inaccessible to the children. Facility has age appropriate furniture. Facility indoor floor is in good repair and free of any hazards.
All bathrooms are in working condition. All storage containers for solid waste fitted lids. Food preparation area is free of litter. Food is stored adequately to prevent contamination. LPA inspected play yard. There is a sufficient amount of poured rubber to help absorb the impact of falls under play structure. There is water available on the yard as well as in the classroom.
Report continues on next page………. |