1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 8/23/2024 Licensing Program Analysts (LPAs) Basak and Quimbo met with the Director, Kristen Mcalister for an unannounced annual inspection. The purpose of the inspection was explained, and LPAs were granted entry. The director and 11 staff were present during LPA’s visit. There were no children during the time of inspection as this week is a teacher's in service week. Per the director children will start on 8/27, Tuesday. The facility operates the childcare from Monday - Friday 7:30 am to 5:00 pm.
According to the director, the facility is using an electronic sign-in/out app called "Transparent Classroom". LPAs observed the facility has licensing documents posted and visible to the public. The facility has a functioning telephone.
Preschool program operates in 3 classrooms: Redwood classroom (3-6 year olds), Pine classroom (3-6 year olds), and Young Children's classroom (18 months to 36 months). Program also utilizes a multi-purpose cottage in outdoor area.
LPAs inspected 2 preschool, 1 toddler room and 2 outdoor playgrounds with the director. LPAs observed facility has multiple smoke and carbon monoxide detectors, and multiple fully charged fire extinguishers in size 2A10BC located in classrooms. LPAs verified with the director the facility has an emergency drill log, and the last drill was conducted on April 23, 2024. Per the Director, drills are conducted every month.
LPAs observed all cleaning supplies and other chemicals are stored inaccessible to the children in facility's high shelves. LPAs verified the facility has a fully stocked first aid kit available in the classrooms.
According to the director, there is only one child with allergies. LPAs checked and observed that the medication was in the original box, updated, included consent form and properly stored in a locked container.
See page 2. |