25 | Licensing Program Analyst (LPA), Shannel Reed, conducted an unannounced annual/random visit to the Facility today. LPA met with Executive Director, Graciela Marques-Hahn and explained the nature of today's visit to her. LPA toured the Facility both inside and outside during today's visit. Facility is licensed to use Buildings 1, 2, 3, 4 and 5. LPA observed the facility in compliance with the required staffing ratios. There were 148 preschool aged children with 19 teachers present during today’s inspection.
LPA observed the required posted materials, including the Facility License, Emergency Disaster Plan (LIC 610), Earthquake Preparedness Checklist (LIC 9148), Parents' Rights Poster (PUB 393), Personal Rights (LIC 613A), Activity Schedule and Menus. The children bring their lunch from home. AM and PM snacks are provided by the facility. LPA observed a 3A40BC Fire extinguishers in each building classroom. LPA observed operational Smoke and Carbon Monoxide Detectors. Log shows that the last Fire Drill was conducted on 10/17/19. The Executive Director understands the conditions, limitations, and capacity specifications of the Facility license. The Executive Director understands that children shall be visually supervised at all times.
LPA reviewed five children's files. Each child's file reviewed contains the required information. LPA reviewed two staff files and found that all have completed the required Mandated Reporter Training (AB1207) and the required immunization against Pertussis, Measles, and Influenza (or opt out letter). There is at least one teaching staff member that has current CPR and First Aid certifications on file. The Site Supervisor understands that there shall be at least one person, with valid CPR and First Aid certifications, on site at all times or present during off-site activities (field trips).
REPORT CONTINUED ON THE FOLLOWING PAGE (REPORT DATED 11/14/2019): |