1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA), Shannel Reed, met with Director, Milinh Villanueva, for an unannounced annual/ random inspection in the Preschool Program. LPA observed 71 napping children with one (1) Aide and six (6) teachers (1 Aide and 1 teacher were on a lunch break). LPA observed the required posted materials, including the Facility License, Emergency Disaster Plan (LIC 610), Earthquake Preparedness Checklist (LIC 9148), Parents' Rights Poster (PUB 393), Personal Rights (LIC 613A), Child Car Seat Law (PUB 269), Snack Menus, and Activity Schedule.
LPA toured the indoor and outdoor areas of the Facility during today's inspection. LPA observed that the classrooms are clean and safe for all children and staff. The Director states that the program has a third party company of janitors that clean the facility Monday through Friday in the evenings and one day on the weekends. Drinking water is readily available for the children inside and outside via water pitchers and disposable cups. LPA observed solid waste containers with tight-fitting lids in the classrooms and outside. The children’s bathrooms are clean, sanitary, and operable. There is a separate staff bathroom not utilized by the children. And a lobby bathroom which an isolated child can use if needed. The Director states that there are no weapons or firearms on the premises.
The facility provides Am and PM snacks for the children. Lunch is brought from home or can be ordered by a third party food service, School Catering Company. Food storage areas are clean, free of litter & rubbish, and free of rodents and other vermin. All food and beverages that require refrigeration are stored in covered containers in the in classroom refrigerators. Cleaning supplies are inaccessible to the children. Any medications at the Facility are stored in backpacks that are locked and hung in each classroom and are inaccessible to children in care. The facility conducts fire and emergency disaster drills every three months. The last fire drill was conducted on 09/20/19 and the last Earthquake (emergency) drill was conducted on 08/02/19.
REPORT CONTINUED ON THE FOLLOWING PAGE (REPORT DATED 09/25/2019): |