1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Glenn Ouye spoke with Site Supervisor Pam McDonald regarding LPA conducting a physical plant inspection. At the time of visit, the site supervisor was cleaning the classroom with one of her staff. The children were not scheduled to arrived until 1:30pm due to hybrid school programming.
LPA was on site to do a capacity determination on a day and time when the children were not present. Two building were inspection. The exterior outdoor play area was also inspected. LPA Ouye and Champions representative conducted a capacity determination at the location which is on the Mary Collins School at Cherry Valley in Petaluma, Ca.
Site supervisor Pam also indicated to LPA Ouye that the program will be closing in the future and that is why the new company is asking for the capacity determination. |