1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 03/03/2022, Licensing Program Analysts (LPAs) Melissa Guirit and Melissa Domantay arrived at the facility for an announced case management inspection for a decrease in capacity from 114 to 102 (90 preschoolers and 12 toddlers). LPAs met with the owner/director Malyka Chop. There were 15 additional staff members and 66 children also present. The facility will be eliminating a portion of the toddler area for the infant component. LPAs toured the facility to conduct a health and safety inspection. The measurements remain the same.
A fire clearance, dated 01/11/2022, was received from the Alameda City Fire Department and shows approval for a capacity of 102 with 90 preschoolers and 12 toddlers.
There is sufficient lighting, heating and ventilation for the safety and comfort of children and staff. There is a centralized fire alarm system in place, carbon monoxide detector, fully charged 3A40BC fire extinguishers, working telephone, and first aid supplies on site. LPAs observed an ample supply of furniture, toys, activities and equipment which are in good condition and age appropriate. LPAs did not observe any bodies of water, hazardous items, toxins or medication that would be accessible to children.. There are 9 sinks and 9 toilets available, which LPAs confirmed are in sanitary and operational condition. There is a separate bathroom for staff.
The outdoor play area is fully fenced and there is an ample supply of toys, equipment and activities available and they are in good condition. All outdoor play areas will be accessible to both programs. |