25 | On this day at around 9:25 am, Licensing Program Analyst (LPA) Luisa Fontanilla arrived at the facility unannounced to conduct annual required inspection. LPA was met by staff Estrellita Sangcal. LPA explained to Sangcal the purpose of the visit. The Administrator arrived at around 9:20 am.
The facility is a Level 4H home vendorized by the Regional Center of the East Bay (RCEB). It has an approved fire clearance for 4 ambulatory and 2 non ambulatory clients.
Upon arrival, LPA observed one client in the home. The other 5 clients were in their respective day programs. At around 10:00 am, the client left for doctor's appointment. LPA inspected the facility inside and out including but not limited to 4 client bedrooms, 2 bathrooms, kitchen, dining area, garage and backyard. Facility was observed clean and odor free. There was sufficient lighting. There were no bodies of water observed. Hot water measured at 107.3 F in the kitchen. There was sufficient supply of perishable and non perishable foods observed. Fire extinguisher in the kitchen was observed full and was last inspected on 10/17/24. Carbon monoxide and smoke detector were tested and observed functional. Medications were observed locked in a cabinet in the dining area.
LPA and Administrator reviewed P&I money and log at 9:45 am. Facility has a surety bond in the amount of $3,000 which is sufficient to cover amount of money being handled at one time.
At around 10:05 am, LPA interviewed medications and Medications Administration Record (MAR). At around 10:20 am, LPA reviewed 5 client files and 5 staff files. All staff were observed fingerprint cleared and associated to the facility. Staff have current first aid and CPR trainings.
Last fire drill was completed on 1/28/25 and last earthquake drill was conducted on 1/27/25.
No deficiencies were observed during the visit. A copy of this report was provided to Lopez.
|