25 | On 10/24/23 at 3:43PM, while at the facility for another reason, Licensing Program Analyst (LPA) toured the facility with executive director (ED) who stated that since the original structural and electrical configurations remained the same, no construction permits were required. ED shared a copy of facility sketch with LPA during visit (see 812 for details).
ED stated that remodelled areas were sectioned off to ensure residents are not impacted by the renovations. ED stated they secured a permit for the new bathroom tiles (see 812 for more details). LPA observed new flooring, paint, furnitures and fixtures on the first, second and 12th floors. LPA observed facility to be clean, bright and in good repair.
No deficiencies cited during inspection.
Exit interview conducted and a copy of this report provided. |