25 | 9/09/2021 8:30 AM Licensing Program Analyst (LPA’s) Dawn Keane and Misty Valencia arrived at the facility unannounced to conduct a Required-1 Year Inspection utilizing the infection control domain. LPA's met with Administrator (AD) Blanca Chavez and Florencio Oliver and explained the purpose of the visit. Prior to initiating the annual inspection, LPA's completed required COVID-19 testing protocols, and a daily self-screening questionnaire for symptoms of COVID-19 infection to affirm no COVID-19 related symptoms; contacted administrator and completed a facility risk assessment. LPA ensured they applied hand sanitizer before entering the facility and the following Personal Protective Equipment (PPE) was worn: N95 masks. Additionally, LPA's Keane and Valencia were screened by Florencio Oliver
LPA's Keane, Valencia and Florencio Oliver toured facility together to ensure health and safety of residents in care. Areas toured include but are not limited to: common areas, six (6) resident bedrooms, three (3) bathrooms, kitchen, storage areas front yard and back yard. In the areas toured no immediate health, safety, or personal rights violations were observed. LPA Keane, Valencia and the AD completed the infection control domain and facility was found to be in substantial compliance at this time.
No deficiencies are being cited as a result of todays inspection.
Exit interview conducted and copy of report was emailed to AD. |