25 | 11/13/2023 10:00 AM Licensing Program Analyst (LPA) Rebecca Knight arrived at the facility unannounced to conduct a Required-1 Year inspection. LPA met with administrator Nora Serrano and explained the purpose of the visit.
LPA Knight and the administrator toured the facility together to ensure the health and safety of clients in care. Areas toured include but are not limited to four (4) client rooms, common areas, two (2) bathrooms, kitchen, storage areas and back yard. Staff and resident files were reviewed. Medications were reviewed. Administrator certificate is current.
Activities are planned for each clients preferences and abilities and staff assists the clients with their activities. Bedding, linens, and towels for clients were observed and found to be clean and in good repair. There is an adequate supply of toiletries for the clients. Medication is locked in a cabinet.
The facility was observed to be at a comfortable temperature. Hot water measured between 105 – 120 degrees F. Common area was clean and in good repair. All bedrooms had required furniture, bedding, and lighting. Bathrooms were clean and in good repair. Kitchen was clean and in good repair. Food appears to be stored and prepared properly. Facility has required (7) seven-day non-perishable and (2) day perishable supply of food. Fire extinguishers fully charged and inspected. Smoke detectors are all operational. No pools/bodies of water are on premises. The last emergency disaster drill was conducted on October 20, 2024. The facility has been conducting fire drills monthly.
No deficiencies are being cited as a result of today’s inspection.
Exit interview conducted and copy of report was provided to administrator Nora Serrano
|