25 | On 03/09/23 at 9:00 AM, Licensing Program Analysts (LPA) Christina Watts conducted an unannounced Annual Inspection at So Big Co-op Preschool. LPA met with Director, Mary Halbasch and explained the purpose of today's inspection. During inspection, there was 7 preschool aged children in care and 10 children enrolled. Also present during inspection was 2 student aides 1 aide and the Director. Facility's operating days and hours are Monday to Thursday from 9:00 AM - 12:00 PM in the Cafeteria Building on the Antioch Fairgrounds. .
The physical plant was inspected. LPA toured the premises.
Indoor space: 1 classroom, restrooms, and pantry were inspected. During inspection, children were engaged in various activities under the visual supervision of the Director, aide and student teachers. Disinfectants, cleaning solutions, and other items that are dangerous to the health and safety of children were stored in places inaccessible to them. Cabinets, drawers, and rooms used for storage were locked. Furniture and equipment were age appropriate and in good condition, free of sharp, loose, or pointed parts. Restrooms for children were observed to be in safe, sanitary, and functioning condition. Floors were clean and free from tripping hazard. Foods and beverages were stored safely. Food storage area were clean, free of litter, rubbish, and rodents/vermin. Trash cans for solid waste had tight-fitting covers on and were in good repair. LPA observed a working Fire extinguisher, Smoke and Carbon Monoxide Detectors. Log shows that the last Fire Drill was conducted on October 20, 2022. Facility does not provide transportation for children, but Director understands that children cannot be left alone, unattended in parked vehicles. Facility’s License, Parents’ Rights Poster PUB 393, Personal Rights, and Activity Schedules were observed to be posted. Director stated there are 2 turtles and 3 birds in the facility.
Facility has not completed Lead Testing requirement. Director stated that she was unaware of requirement for Lead Testing. Director stated she will complete Lead Testing requirement by the end of the month. *CON'T ON PAGE 2* |