25 | On 02/025/2025 at 1:00PM, Licensing Program Analysts (LPAs) T. Syess-Gibson and C. Fowler, arrived unannounced to continue the 1-Year Annual Required inspection visit. LPAs met with Executive Director (ED), Scott Shahade, and explained the purpose of the visit. The facility’s fire clearance was approved for 190 non-ambulatory and 10 bedridden residents. Facility has hospice waiver for 20 residents.
LPAs toured the facility with Administrator including but not limited to apartments, bathrooms, kitchen, common area and outside. LPAs toured apartments #002, #015, #113, #117 and #145. All outdoor and indoor passageways are kept free of obstruction. LPAs did not observe any bodies of water. A comfortable temperature is maintained at 72 degrees Fahrenheit. LPAs observed lighting in all rooms are adequate for the comfort and safety of the residents. The hot water temperature in the residents’ shared bathroom was measured at 119.0 degrees Fahrenheit. Residents’ bathrooms are equipped with grab bars and non-slip shower mats. There is a minimum of 7-day supply of non-perishable and 2-day of perishable foods.
Smoke detectors and carbon monoxide were in operating condition during visit. Fire extinguisher was last serviced on 04/24/2024. Emergency disaster plan last updated 02/01/2024. First aid kit was observed to be complete. Fire drill was last conducted on 01/15/2025.
Continued LIC809C. |