25 | On 5/12/2022, Licensing Program Analyst (LPA) L. Ibo conducted an infection control annual inspection and explained the purpose of the visit with Mark Ruiz,licensee and Brian Llagas, staff. LPA called Administrator but no answer, licensee stated that Administrator is not available.
LPA observed 6 clients during the visit. Facility has a completed mitigation plan. LPA inspected the facility inside and outside. LPA observed COVID-19 signage posted in common areas to promote hand washing, cough/sneeze etiquette and physical distancing. Pathways were observed to be free of obstruction and fire hazards.
Infection control designated leader is the Administrator. There was at least 7 days of nonperishable and 2 days of perishable foods. Facility room temperature was maintained at 76 degrees Fahrenheit. A certified administrator is on site a minimum of 20 hours a week to oversee proper business operation. Smoke and Carbon monoxide detectors were operational.
LPA observed the following:
ยท Facility altered garage, added staff room, office and change flooring without notifying CCL and city planning office.
Deficiencies are cited from Title 22 California Code of Regulations (see 809D). Failure to submit proof of corrections by plan of correction due dates, and any repeat violations within 12-month period may result in civil penalties.
Deficiencies and plan and proof of corrections were discussed with Mark Ruiz
Exit interview conducted and a copy of this report provided. |