25 | On Friday, February 6, 2026, at approximately 10:05 AM, Licensing Program Analyst (LPA) Aurelio Mendoza and Licensing Program Manager (LPM) Joe Pacheco arrived at the facility to conduct an announced case management inspection. Upon arrival, LPA and LPM met with Director Cynthia Alvarado. Also present was administrative staff from Reading and Beyond, including Site Supervisor Jasmine Parra. The purpose of today’s inspection was to review Title 22 regulations and provide technical assistance as the licensee prepares to resume child care services on February 17, 2026. No children were present during today's inspection.
During the inspection, LPA and LPM discussed physical plant requirements, including square footage per child and the required number of toilets and sinks. The team toured two classrooms (Room 1 and Room 2) and observed that both rooms were equipped with safe, age-appropriate furniture and materials, including tables, chairs, cubbies, napping cots, bookshelves, and various activity supplies. Drinking fountains were available in each classroom for water consumption.
Measurements confirmed that the combined square footage of both classrooms is approximately 1,639 square feet, which supports a maximum of 46 children based on Title 22 requirements of 35 square feet per child. However, the facility currently has only two toilets and eight handwashing sinks, which meets the requirement for a maximum of 30 children (one toilet and one sink per every 15 children or fraction thereof). To remain in compliance, the facility will need to apply for a capacity decrease to no more than 30 children (continued on LIC809-C).
|