1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 1/31/24, Licensing Program Analysts (LPAs) Joseph Pacheco and Yesenia Fierro conducted an announced pre-licensing inspection and met with Director, Monica Peterson. LPA reviewed the reason of the inspection, and a tour of the center was conducted inside.
During today's inspection, LPA verified the following items have been corrected:
Inside Daycare:
1) Anchor play equipment in the corner to prevent from tipping over.
2) Obtain and install a working carbon monoxide detector.
Pending a final file review, a recommendation will be made to license the above facility for the requested capacity of 15 preschool children.
Exit interview conducted and report was reviewed with Director, Monica Peterson. A copy of this report is to remain in the facility for public review. This report shall be made available to the public upon request.
To order forms, etc. visit our website at www.ccld.ca.gov |