25 | A Case Management inspection was conducted by Licensing Program Analysts (LPAs ), Jillinda Chandler and Shandra Powell. LPA met with Licensee, Jennifer Carter who guided LPAs on a tour of the facility. The purpose of the inspection is due to a pending application for a Capacity Change. Licensee submitted an application to increase the capacity for the Infant Program on 04/12/2022. This facility is currently licensed for a capacity of 31 Preschool children and 6 Toddlers. The Licensee is requesting to increase the Preschool from 31 to 39 and the Toddler Option from 6 to 10. Fire clearance is on file and has been approved for 49 Preschool children with a Toddler Option of 10 children total. Based on the previous inspection conducted on 03/24/2022 and today's observation and facility sketch review there were no structural changes made to facility. The previous measurements taken on 03/24/2022 were used to determine the capacity increase.
The following measurements were taken on 03/24/2022:
Toddler Indoor activity space: 368.75 divided by 35 sq. ft. = a total of 10 children
Toddler Outdoor activity space: 655.25 divided by 75 sq. ft.= a total of 8 children
Preschool Indoor activity space: 1396.7 divided by 35 sq. ft. = a total of 39 children ( the enclosed activity area was not added to this space in the initial licensing, was added today)
Preschool Outdoor activity space: 3039 divided by 75 sq. ft.= a total of 40 children
4 toilets; 1 toilet per 15 children = 60 children + changing table
4 sinks; 1 toilet per 15 children = 60 children |