1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analysts (LPAs) Gary Tan and Antonia Alvizar-Ettima conducted an unannounced Required One (1) year inspection at this facility. LPAs met with staff Maria Heredia who called the administrator and explained the reason for the visit. The Assistant Administrator Adam Braun arrived forty (45) minutes later.
A tour of the physical plant was conducted at 9:48 AM and the following was noted:
There is only one entrance being utilized at the facility, there are required posters posted at the main door. Screening area is located immediately upon entrance. Sign in sheet and hand sanitizer is available. The facility had submitted and approved Mitigation Plan and Infection Control Plan.
Signs of COVID-19 prevention protocol were posted inside. Hand washing, coughing etiquette, physical distancing and other necessary signs were posted in the bathroom and all over the facility. The facility has multiple screening stations all through out the facility. The facility has sufficient stock of PPE in the storage.
The facility has fifteen (15) bedrooms and nine (9) bathrooms in multiple interconnected residential type building. The facility is fire cleared for thirty (30) non-ambulatory residents, twenty three (23) of which maybe bedridden in rooms 1 to 15. Hospice waiver for ten (10) residents.
Living and dining rooms furniture were checked. The living rooms were neat, clean and in proper order. The facility maintains a comfortable temperature at 75°F. The smoke detectors are hardwired and interconnected and observed to be operational. There are carbon monoxide detectors installed in the facility. Fire extinguishers are located all throughout the facility and last inspected on 11/08/23. The facility is equipped with sprinkler system. (continued to LIC 809-C) |