1
2
3
4
5
6
7
8
9
10
11
12
13 | Licensing Program Analyst (LPA) Kruz Long conducted an unannounced complaint investigation at the facility. Upon arrival, LPA met with Araceli Dimaguila (RN) and explained the purpose of the visit.
During today's investigation, LPA obtained a copy of the Staff, Resident roster and repair invoice. LPA interviewed Staff #1, #2 and #3 in the conference room between 10:00 am to 10:37 am. LPA toured the facility with Staff #3 at 10:40 am, measured the water temperature in various bedrooms and interviewed Residents #1 to Resident #10 between 10:45 am to 12:00 pm in various locations of the facility .
In regards to the allegation: Facility does not have adequate hot water available to residents. LPA reviewed a copy of a service invoice dated 12/13/21 indicating a water pipe was replaced due to leakage. Services were rendered the same day on 12/13/21. Interviews with Staff indicate that in the past month the only water issue the facility experienced was on 12/13/21 and the problem was resolved with a water pipe replacement. Continue to LIC9099C...... |