1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 11/08/2023 at 9:40 a.m. Licensing Program Analyst (LPA), Evelin Rios, conducted an unannounced Annual Required visit at this facility. LPA was greeted by Staff #1(S1), who granted access to the facility. LPA informed S1 the purpose of the visit and S1 called Administrator Clifton Von Buck who informed LPA they will meet LPA at the facility.
At approximately, 10:00 a.m. LPA interviewed Client #1 (C1) who was present at the start of the visit before they went out to the community. At approximately 10:10 a.m. LPA interviewed S1. At approximately 10:25 a.m. LPA and S1 conducted a physical plant tour of the facility and the following was observed:
Infection control: Upon arrival, LPA was asked to sign-in the visitors’ log. Covid-19 signs were observed inside the facility along a wall leading too the kitchen. Hand sanitizer was also observed. S1 stated they have sufficient PPE supplies for clients and staff.
Bedrooms: There are four (4) bedrooms, three (3) of which are designated for client use. LPA observed rooms to be properly furnished, clean and have appropriate bedding and have sufficient lighting. One (1) bedroom is for live-in staff. LPA observed a built in cabinet by the bedrooms with extra linens.
Bathrooms: There are two (2) bathrooms total. One (1) is designated for clients and the other is located in the staff bedroom for staff only. LPA observed the bathroom to be clean and in good repair. Properly supplied with toilet papers, soap and an automatic hand dryer. The hot water temperature measured at 113.4°F at approximately 10:30 a.m.
Smoke detectors/carbon monoxide. Smoke detectors were located throughout the facility, and at 10:40 a.m. S1 tested a detector and LPA observed it to be operational. Carbon monoxide detector was observed in the main entry by the kitchen and observed to be functional. (Continued on LIC809-C) |