25 | On 06/16/23, Licensing Program Analyst (LPA) Lizeth Villegas conducted an unannounced annual required visit using the CARE Inspection Tool. LPA met with house manager Renel Cabral and later joined by Administrator Mark Meneses as the purpose of today’s visit was explained. The facility is licensed to serve elderly residents age 60 and above. All five (5) rooms are cleared for bedridden fire clearance. Facility is cleared for six (6) bedridden residents and the facility is approved to admit or retain two (2) residents on hospice. The facility is 87705 compliant.
The facility is a single-story structure located in a residential neighborhood and consists of the following: six (6) resident bedrooms, one (1) staff rest/break room, three (3) bathrooms, living area, dining area, kitchen, and outside covered patio area.
LPA conducted a records review of one (1) staff records, two (2) resident records and two (2) Medication Administration Records, LPA did not observe any discrepancies at the time of visit. Medications were centrally stored and properly locked, first aid kit was checked and fully stocked. The last fire drill was conducted on 05/02/23, three (3) fire extinguishers fully charged, carbon monoxide detectors and smoke detectors interconnected are working properly. Landline was observed.
All resident rooms were checked, mattresses and box springs were in good condition, adequate lighting, plenty of dresser and closet space was observed. Bathrooms were found to be within Title 22 regulation, toilets and water faucets worked properly, shower was free of mold/mildew, all grab bars were securely attached, and all showers had a non-skid mat and there is sufficient toiletries accessible to residents. The water temperature properly measured between 105-120 F..
|