32 | LPA Scott also observed that there were sufficient bedding, linens, and towels accessible to clients, and observed fully stocked bedding and towels in the hall closet. Additionally, LPA Scott observed the bathrooms, and they were found to be within Title 22 regulation. Bathroom fixtures are clean, in good repair, and working properly; and had the required grab bars and non-skid floor mats. Water temperature properly measured at 106.5 degrees F for the facility. Perishable (7 day) and non-perishable (2 day) food supply were checked and are adequately stocked.
Smoke/carbon monoxide detectors are hard-wired throughout the facility, they were tested and working properly. The facility (1) Fire Extinguisher was fully charged and accessible and last serviced on 04/12/22. Further, the last fire drill occurred on 08/13/22.
All toxins and knifes are locked/secured and inaccessible to residents. Medications are centrally stored and in a locked storage cabinet. Facility first aid kit and manual was checked and in order. Outside grounds were toured and no bodies of water were observed. Outside patio is accessible to clients. All Exits/ Walkways around the home were free of debris and hazards.
LPA gave the facility a technical advisory because there wasn’t a sign in book at the screening point.
During the visit, LPA observed the following to be complying: the facility's infection control practices; screening protocols for visitors, staff, and residents, sanitizing stations in common areas and restrooms; every staff was wearing a face covering; the facility has a 30-day supply of Personal Protective Equipment (PPE). All mandated inspection control posters were posted. The facility has a Mitigation Plan Report approved by CCLD. Report continued form LIC 809-C
|