1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Alberto Lopez conducted an unannounced Required- 1 year visit using the full Care Compliance and Regulatory Enforcement (CARE) Tools. The purpose of the visit was explained to Director of Health services Arienne Ghammangne and Administrator Rochelle Carpio arrived a short time later and assisted with the visit. The following 12 (CARE) tool domains were utilized during the inspection:
Infection Control:
Infection control practices and Personal Protective Equipment (PPEs) were observed. There is a visitor sign-in station located in the main entrance. The facility has an Infection Control Plan.
Operational Requirements:
A current Plan of Operation was reviewed. The facility serves residents 60 years and older, and a Hospice Waiver for ten (10) resident is approved.
Liability Insurance in the amount of at least ($1,000,000) per occurrence and ($3,000,000) in total annual aggregate is in place. A surety bond is not applicable. Facility does not handle resident's money.
Physical Plant/Environment Safety:
The facility consists of a 2 story building with resident rooms on both floors. The main floor has a lobby, library, bistro area, dining room, kitchen, administrative offices, and spacious outdoor patio. The 2nd floor consists mainly of resident rooms and a dining room. There are no swimming pool or bodies of water on the premises. There are no firearms or weapons stored at the facility. LPA selected random rooms - (rooms #157, #159, #161, #204, #203, and #223) to measure the hot water temperature.
|