13 | Licensing Program Analyst (LPA) conducted an unannounced subsequent complaint visit at this facility to further investigate the above allegations. LPA initially met staff Jaqueline Montoya who called the Administrator Oscar Chavez and explained the reason for the visit. Mr. Chavez is indisposed at this time.
LPA conducted physical plant tour at 9:31 AM, requested copies of facility documents relevant to the investigation at 10:00 AM, reviewed documents between 10:00 AM to 11:00 AM and interviewed staff and residents between 11:00 AM to 1:00 PM. Regarding the allegation that the Facility does not have hot water, LPA's observation during visit on 01/13 26, hot water temperature at building # 1 measured at 107.2°F, building #2 at 114.6°F, building #3 at 118.1°F, building #4 at 112.5°F and building #5 at 111.3°F. During today's visit, hot water temperature at building # 1 measured at 106.7°F, building #2 at 113.0°F, building #3 at 116.2°F, building #4 at 118.8°F and building #5 at 108.2°F. All were within the required range. LPA's interview with five (5) residents today or 10% of the current census revealed that five (5) out of five (5) residents interviewed stated that they always have hot water in their building. (continued on LIC 9099-C) |