25 | A Required Annual visit was conducted today by Licensing Program Analyst (LPA) Gary Tan. LPA met with the Administrator Arevhat Asiryan. The facility has no client at this time as the vendorization application at the North Los Angeles Regional Center is still pending at this time. The facility applied to serve Level 2 clients.
At 3:15 PM, A tour of the physical plant was assessed with the administrator and the following was noted:
The only entrance being utilized is the main front door Screening area is located immediately upon entrance. Sign in sheet, hand sanitizer, gloves and masks are available. The facility had submitted and approved Mitigation and Infection plan.
Signs of Covid 19 prevention protocol were posted in the Bulletin Board immediately upon entrance. Hand washing, coughing etiquette, physical distancing and other necessary signs were posted in the bathroom. All trash cans were observed to be with cover. The facility has a designated visitors' area at the back backyard. The facility has sufficient stock of PPE in the storage room.
The facility has a total of four (4) bedrooms and two (2) bathrooms. One (1) bedroom and one (1) bathroom is designated for staff use. There is no body of water in the facility.
Bedrooms were toured and observed to be clean and properly furnished. Linen storage was also checked and observed to have ample supply of clean linen and towels.
Bathrooms were observed to be clean and sanitary with necessary supplies. Hot water temperature was measured at 116.6°F and within the required range.
(continued on LIC 809-C) |