25 | Licensing Program Analyst (LPA) Seung Lee conducted an unannounced plan of correction inspection. Upon arrival LPA Lee met with site supervisor Rina Giron.
On 10/27/2023, this facility was cited because 3 sources of water in the facility (1 sink and 2 drinking fountains) had Action Level Exceedance that were too high. The facility agreed to modify the sources of water and to have them retested.
During the inspection conducted on this date, the facility stated that sources of water was retested on 01/05/2024. The facility stated that modifications to the water sources was completed during 12/2023 and the vendor was contacted to conduct another test. During the inspection the facility was able to provide a document from A-tech consulting inc. that stated that 3 sources of water for this facility was retested on 01/05/2024.
Since the results of the retest is not available yet per document, no further action will be required for the facility at this time until the results of the lead test are available.
The notice of site inspection must remain posted for a period of 30 days during hours operation. Failure to maintain posting will result in a civil penalty of $100.00 dollars.
Exit interview conducted with site supervisor Rina Giron. Appeal rights discussed and explained. |