13 | On January 24, 2025, Licensing Program Analyst (LPA) Monique Ayala conducted an unannounced complaint investigation for the above allegation. LPA met with director Joshua Goldman who guided LPA on a tour of the facility. LPA observed 31 children in care with 7 staff.
During the inspection LPA obtained a copy of the facility roster, obtained a copy of disaster drill log and LPA interviewed Staff #1 (S1) to Staff #5 (S5) and interviewed Reporting Party (RP).
RP alleged, "Staff are falsifying emergency drill documents". Per RP, during LPAs visit for an annual inspection on 01/16/2025, S1 asked RP, to provide dates for September and November to complete the disaster drill log. Per RP, the dates they provided were 09/19/2024 and 11/13/2024. The date, 11/13/2024 is that date LPA observed in the disaster drill log and documented on LIC809 for annual inspection. |