1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | Bedrooms Staff:
There will not be a live-in staff worker.
Bathrooms:
The home has two (2) bathrooms. Bathrooms are adjacent to each room. All bathrooms have a working toilet, washbasin, and shower with grab bars and non-skid mats.
Linens & Hygiene Supplies:
Beds have the required linen supplies which include, pillowcases, mattress pads, fitted sheets, blankets, and bedspreads. An adequate supply of linen is stored in the hall closet.
Emergency Phone Numbers, Exit Plan & Menu:
Emergency phone numbers. The exit plan and menu are posted and readily available for review in the living room. There are two (2) fire extinguishers located in the kitchen mounted on the wall, as well as in the hallway. A working telephone line is available in the kitchen. Emergency supplies and Personal Protective Equipment supplies are stored in the garage. The applicant has submitted a Mitigation Plan.
Food Service:
Dishes, cups, and flatware are stored in the kitchen cabinets, inspected, and in good repair. Knives, cutlery, and other sharp kitchen utensils are stored in a locked drawer. Food supply is adequately stored in kitchen cabinets and consists of boxed and can goods. The kitchen counters also had small appliances.
Smoke Detectors:
Smoke and carbon monoxide detectors throughout the interior space were operable.
Toxins:
All toxins are locked and stored under the kitchen sink cabinet and in the garage.
Stove burners, oven, microwave, washer, and dryer are working. The kitchen counters also had small appliances which include a coffee maker and toaster oven. There is one (1) refrigerator in the home. The home is equipped with central heaters and air conditioning systems.
Water Temperature:
The water temperature is 109.4 f degrees throughout the kitchen and bathrooms.
Evaluation Report Continues on LIC809-C
|