1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | Operational Requirements: Fire Drills are conducted every month, the last fire drill was conducted on 8/04/23. Emergency Disaster/ Earthquake Drills are also conducted every month and the last one was conducted on 8/04/23. Facility Administrator is adhering to operational requirements.
Physical Plant & Environment Safety: The home is located in a residential area. The following was inspected and toured: facility consists of a tour of the two-story facility includes: (First floor) living room, detached garage/storage/office, dining room, kitchen, laundry room, three client bedrooms, one staff bedroom, two bathrooms, one project room, and a den. All client rooms were checked. All clients beds have the required linens which were in good condition at the time of the visit. All bedrooms had sufficient closet/ storage space. Bathrooms are clean and operational and were observed to be within Title 22 regulations. Facility toilets and water faucets worked properly. Shower was free of mold/mildew, adequate lighting, and sufficient toiletries are accessible to clients. Water temperature properly measured at 120F*. Facility temperature was comfortable throughout the facility. LPA observed the facility to be clean and in good repair. First aid kit is fully stocked with manual, smoke detectors and carbon monoxide detector were in compliance and operational. No firearms are stored at facility and no bodies of water present. Medications are stored, locked and inaccessible to clients. Hazardous toxins and/or items are inaccessible to clients, fire extinguisher(s) are fully charged. Exit, walkways and/or passageways, front and back yard are free of debris and/or hazards. A shaded area with chairs is provided for clients in the patio area in the backyard of the facility.
Staffing: There is sufficient staffing at the facility. Staff employed are over the age of 18 and are fingerprint cleared and associated to the facility.
Personnel Records-Training: Staff files are maintained at the facility. LPA reviewed staff files for Facility Administrator. Staff have current CPR/first aid training and sufficient on-going training that meets the annual requirement. Staff have their Health Screening and Tuberculosis Screening on file. Staff are also trained on Abuse Reporting. Administrator certificate expired on 5/30/2023. Administrator stated the renewal documents were submitted to the recertification unit but an Administrator Certificate has not been received yet. Proof of document submittal was provided.
Refer to LIC 809C for continuation of report |