1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32 | Operational Requirements: Fire Drills are conducted monthly, the last fire drill was conducted on 4/15/23. Emergency Disaster/ Earthquake Drills are conducted monthly and the last one was conducted on 4/20/23. Facility Administrator is adhering to operational requirements.
Physical Plant & Environment Safety: The facility is a two story home located in a residential neighborhood and consists of: First floor consists of the dining room, living room, kitchen, staff office, bathroom, relaxation room, and client dining area. Second Floor consists of: 4 bedrooms (one staff bedroom and 3 client rooms) and a recreation room. Physical plant inside and outside is in good repair. All client rooms were checked and observed to have the required furniture for comfort and safety such as bed frames, dressers, lamps and chairs and all had sufficient lighting. Clients beds have the required linens which were in good condition at the time of the visit. All bedrooms had sufficient closet/ storage space. Bathrooms are clean and operational and were observed to be within Title 22 regulations. Toilets and water faucets worked properly. Shower was free of mold/mildew, adequate lighting, and sufficient toiletries are accessible to clients. Water temperature properly measured at 109F*. Facility temperature was comfortable. LPA observed the facility to be clean and appropriately furnished with clear passageways inside and outside. First aid kit is fully stocked with manual, smoke detectors and carbon monoxide detector were in compliance and operational. No firearms are stored at facility and no bodies of water present. Medications are stored, locked and inaccessible to clients. Hazardous toxins and/or items are inaccessible to clients, fire extinguisher is fully charged. Exit, walkways and/or passageways, front and back yard are free of debris and/or hazards.
Staffing: There is sufficient staffing at the facility. Staff employed are over the age of 18 and are fingerprint cleared and associated to the facility.
Personnel Records-Training: Staff files are maintained at the facility. LPA reviewed staff files for Facility Administrator, and S1. Staff have current CPR/first aid training and sufficient on-going training that meets the annual requirement. Staff have their Health Screening and Tuberculosis Screening on file. Staff are also trained on Abuse Reporting.
Refer to LIC 809C for continuation of report |