1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 11/01/23, Licensing Program Analyst (LPA), Wendy Gibbs, conducted an unannounced annual visit using the full CAREs tool. LPA met with Administrator, Jasmine Hezar, and the purpose of this visit was explained. The facility is licensed for 115 non-ambulatory, four of which may be bedridden, age 60 and over. The facility has an approved hospice waiver for 10. The facility is approved for a delayed egress exiting on the second floor, and a waiver granted for a secured perimeter. Currently there are 59 residents residing at the facility.
Structure/Physical Plant LPA toured the facility with Administrator. The facility is a three-story commercial building. The facility consists of the following: The first-floor Lobby/receptionist area, Executive Director's office, Business office, copy area, Marketing office, living room, library/activity room, cafe/bistro/latte/water area, public/visitor restrooms, hair salon, life enrichment/activity office, storage rooms, dining room, commercial kitchen, staff restrooms, commercial laundry room, resident's laundry room, Director of Nursing office, medication room, employee's lounge, emergency food, mechanical room, electrical room, 3 storage rooms, and attached underground security parking garage. The second floor consists of resident's bedrooms and bathrooms, storage closets, and patio. The Memory Care Unit (MCU) consists of bedrooms and bathrooms, resident's laundry room, dining room/activity room, small kitchen, living room/TV room, shower room, Memory Care Coordinator office, small living room, storage room, and MCU patio. The third floor consisted of bedrooms and bathrooms, resident's laundry room, small living room/TV room.
Bedrooms LPA inspected 8 resident rooms that were observed to be clean and in good repair. All rooms were observed to have the required furnishings including a bed, dresser, nightstand, chair, and ample storage space for personal belongings. Residents furnish their rooms, but there is furniture available if needed. All beds had the required linens including a mattress cover, fitted sheets, blanket, comforter, and pillows. All rooms were observed to have ample lighting.
Bathrooms All bathrooms inspected were observed to be clean and operational. All showers had secure safety handrails, non-skid mats, and/or a shower chair. The water temperature measured between 114.5-degrees and 116.8-degrees Fahrenheit.
Continued on LIC809-C |