1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | On 11/7/2022, Licensing Program Analysts (LPAs) Stephanie Vega-Gonzalez and Joseph Pacheco conducted an unannounced case management inspection. LPA met with Early Childhood Education (ECE) Specialist, Rhiana Thornton and toured the facility inside and outside and a census was taken for classroom. The purpose of today's inspection was to inspect new play equipment that was installed in the outdoor play area for use for the preschool children.
LPA observed two slides and adequate wood chips surrounding the play structure. The play structure has two shades installed to provide adequate shade. Mature trees provide additional shade. Children access the slide by walking up stairs. Wood chips are being used for cushioning. Adequate cushioning around the slide and play structure was observed to absorb falls. Manufacturer specifications state the new play equipment is suitable for children ages 2-5 years old. Outdoor activity space surface is maintained in a safe condition and is free of hazards. Playground equipment is in good condition, free of sharp, loose, or pointed parts. LPA reminded ECE Specialist, Rhiana Thornton to ensure that manufacturer’s instructions are followed at all times when using the equipment and reminded ECE Specialist, Rhiana Thornton to discuss with staff best practices for maintaining visual supervision at all times when children are playing outdoors.
Effective today, 11/07/2022, the facility may begin using the new outside play equipment for preschool children.
Per Title 22, Division 12, Chapter 1, of the California Code of Regulations, no deficiencies are cited.
Exit interview conducted and report was reviewed with ECE Specialist, Rhiana Thornton.
This report shall be made available to the public upon request. A notice of site visit was given and must remain posted for 30 days. Failure to comply with posting requirements shall result in an immediate civil penalty of $100. |