25 | On this date, Licensing Program Analyst (LPA) L. Salazar contacted the facility to conduct a Pre-Licensing inspection via virtual conference due to COVID-19 and precautionary measures. LPA identified herself and discussed the purpose of the inspection with facility Executive Director, Martin Vale. Facility fire clearance for 162 non-ambulatory residents and delayed egress. Administrator certificate is current.
LPA conducted an annual inspection January 2020 and toured the facility inside and out. There have been no changes since inspection to the indoor or outdoor spaces. Passageways and exits were clear and free from obstruction. Smoke and carbon monoxide detectors were observed in required rooms and were functioning. Resident bedrooms and facility common areas were adequately furnished and lit. Hot water temperature was within required range. LPA reviewed facility the Emergency Disaster Plan LIC 610D, current facility roster and completed Component III with Executive Director.
Pre-Licensing is complete and this facility. No deficiencies observed. Exit interview conducted with Martin Vale and a copy of this report was provided via email. A read receipt confirms the licensees receive these documents. |