25 | At approximately 8:15AM, Licensing Program Analyst (LPA) Chris Arnhold arrived at this facility unannounced, to continue the Annual Required inspection for this facility. LPA met with Administrator Jotham Gikuhi and Judith Karhoro. At approximately 8:30AM, LPA reviewed 4 of 4 Client records and 4 Staff records, which were all found to be well organized, thorough and contained the required documentation. First aid and CPR certification were current in staff files reviewed. P&I monies were documented, secure and not commingled. Administrator's Certificate was current.
LPA retested the water temperature in the client bathroom and found it to be still above the regulation of 105 to 120 degrees F.
Updated copies of the following documents were requested for facility file and are to be submitted to CCL within 30 days of this visit:
LPA received copy of Surety Bond during visit.
Control of property documentation
LIC500- Personnel Report
LIC308- Designation of Responsibility
LIC610D- updated Disaster Plan
Deficiencies are cited from the California Code of Regulations (CCRs), and/or the Health and Safety Code. Failure to correct the cited deficiency(ies), on or before the Plan of Correction (POC) due date, may result in a civil penalty assessment.
This report was reviewed with and Judith Karhoro and Appeal rights were given. |