1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA’s) Bernadette Allen made an unannounced visit to the facility to conduct a required comprehensive annual inspection. LPA met with Jon Peralez- Administrator who assisted with the tour of the facility.
Physical Plant: The facility is operating in the capacity approved by Community Care Licensing (CCL). There are no obstructions to indoor and outdoor passageways. The facility is maintained at a comfortable temperature. LPA inspected resident’s bedrooms; they are equipped with required furniture such as: mattresses, night stands, storage space, and sufficient lighting; bathrooms were clean, and appliances were operating appropriately.
LPA observed sufficient furniture and lighting throughout the facility. The facility is equipped with operating smoke detectors, fully charged fire extinguisher, and carbon monoxide alarms. Posters such as personal rights, the CCL complaint poster, ombudsman poster, and the disaster plan were posted in a common area. Cleaning supplies, toxins, sharps, and other dangerous items were kept inaccessible to residents in care.
LPA observed there was a designated storage space for resident/staff files. Medications are kept locked in storage cabinet and medication office inaccessible to residents in care. Medications were audited at random and appeared to be dispensed appropriately by staff members. Overall, the facility is clean, in good repair, and operating in safe conditions for residents in care.
Food Service: Non-perishable and perishable food supply is sufficient for number of residents in care.
Care & Supervision: Facility has sufficient care staff for coverage 24 hours a day, 7 days a week. All staff members working in the facility have criminal record clearance through the department. |