25 | Licensing Program Analyst (LPA) Michael Tea conducted an unannounced Annual Required inspection of the facility. Upon arrival, LPA Tea was greeted by facility staff, granted entry, and explained the purpose of the visit. Executive Director (ED) Brisseth Arrellano and Business Operations Manager (BOM) Patricia Jimenez arrived shortly to assist with the inspection.
The facility is licensed to serve 140 non-ambulatory residents, of which eight (8) may be bedridden, and has a hospice waiver for 15 residents. At the time of the visit, the facility had a census of 108 residents, of which 11 were receiving hospice services.
LPA Tea reviewed eleven (11) resident files and five (5) staff files. The resident and staff files reviewed contained the required documentation. ED Arrellano's Administrator Certificate is valid through July 7, 2027.
LPA Tea, accompanied by ED Arrellano and BOM Jimenez, toured the physical plant, including resident living areas, common areas, food service areas, and outdoor spaces.
The facility is a two-story building with a memory care wing, known as "Clare Bridge," located on the first floor. The facility has a centrally located courtyard with shaded patio seating, as well as a separate Rose Garden courtyard available for residents. The memory care unit has its own secured private courtyard with ample seating. LPA tested the delayed-egress system around the memory care courtyard and found it to be operational.
The facility's fire alarm system is monitored and maintained by a third-party company. Fire extinguishers throughout the facility were observed to be fully charged. LPA also observed evacuation chairs located in each stairwell for emergency use. The facility's most recent disaster drill was conducted on August 13, 2026.
(Inspection Report continued on LIC809C)
|