1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Norman Woodridge conducted a Covid-19 Annual Inspection at the facility. Upon arrival, LPA signed in and completed a temperature check. LPA met with Administrator, Romel Bisda, informed AD of the purpose of the visit, and conducted a tour of the inside and outside of the facility, common areas, kitchen, bedrooms, bathrooms, and garage.
LPA discussed and observed the following:
LPA observed Covid-19 station with sign in sheet, hand sanitizer, and disinfectant wipes. The facility also requires temperature checks for all visitors and staff. LPA observed a 2-day supply of perishables and a 7-day supply of nonperishables. LPA observed 30-day PPE supply. Hallways and walkways were free from obstruction. LPA reviewed Covid-19 temperature log for residents. LPA provided technical assistance on documenting temperature for staff members and Covid-19 related signage. LPA provided technical assistance regarding Covid-19 related training and documentation. LPA discussed updated Covid-19 requirements including surveillance testing, signage, Covid-19 reporting requirements, and documentation.
No deficiencies were noted during the inspection.
An exit interview was conducted with AD and a copy of this report was provided. |