1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Tricia Danielson conducted an unannounced annual inspection on October 15, 2025 at 1:30 PM. LPA met with Site Director Alejandra Piedra, who provided a tour of the school-age center. This facility is not a combination childcare center.
During the inspection, several key facility items were observed. These included the facility's license, the Emergency Disaster Plan (LIC610) and Earthquake Preparedness Checklist (LIC9148), the Parent’s Rights Poster (PUB393), Personal Rights (LIC613A), the Child Car Seat Law notice, and the menu. The facility was found to be operating within the limits stated on its license, and staff-to-child ratios were observed to be 50 children to 4 staff. Classrooms were adequately equipped with age- and size-appropriate furniture and materials, ensuring a safe and hazard-free environment. The facility representative confirmed that no weapons were present on the premises.
There were no accessible bodies of water onsite. Director Piedra is aware that any wading pools or similar products must be emptied immediately after use and stored in an upright position. Drinking water was available both indoors and outdoors via filtered and bottled water. LPA verified that lead testing was completed on September 30, 2022, and the next testing is due by September 30, 2027.
Medications, disinfectants, cleaning solutions, and other hazardous materials were stored in locations inaccessible to children, while poisons and toxins were securely locked away. The facility’s floors were observed to be safe and clean, and bathroom facilities were
(CONTINUED ON LIC 809-C)
|