1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Brian Morris conducted an unannounced annual inspection for a large family childcare at the above home on 03/11/2026 at 09:45 AM. LPA met with Licensee Rohan Leonidas and Wasantha Leonidas, who guided LPA on a tour of the home. There was 03 child present with Licensee/Licensee when LPA arrived. During the visit, the facility had 11 children enrolled and 03 children present.
The facility operates Monday through Friday from 06:30 AM to 06:30 PM each day. Certain areas are off-limits, including the entire second floor, ALL upstairs bedrooms, ALL upstairs bathrooms, Family room (Front), Side yard (gated), and garage. The facility is licensed as a large Family Child Care Home (FCCH) with a maximum capacity of fourteen children and is operating within the licensed capacity of the license. The fire clearance for a large family child care was approved on 02/17/2017 by Menifee Fire Department.
During the inspection, LPA observed Licensee to be responsive and aware of where the children were at all times. A working cell phone/landline telephone is available, and the current phone number on file is correct. A fully charged fire extinguisher (2A:10BC) was observed, along with a functioning smoke detector and carbon monoxide detector, both of which were tested by the Licensee. The fireplace is properly screened to prevent access by children, and all hazardous items, including toxins, are stored securely and are inaccessible to children. No weapons are present, and the Licensee, Leonidas, understands that all firearms, weapons, and ammunition must be locked separately and made inaccessible as per Title 22 Regulations. Stairs are barricaded with a baby gate when children are in care.
The facility provides clean, safe, and age-appropriate toys for children. A current roster is on file, and required postings, including the Facility Sketch, Emergency Disaster Plan, and Notification of Parent’s Rights, are displayed. Fire and disaster drill documentation is maintained, with the last drill conducted on January 29, 2026.
|