1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Brian Morris conducted an unannounced annual inspection for a large family childcare at the above home on 06/23/2025 at 08:53 AM. LPA met with Licensee Ingrid Lobos, who guided LPA on a tour of the home. There were 07 (SEVEN) children present with Licensee/Assistant when LPA arrived.
The facility operates Monday through Friday from 07:00 AM to 06:00 PM each day. Certain areas are off-limits, including the entire second floor, ALL upstairs bedrooms, ALL upstairs bathrooms, Dining room, 1st floor bedroom, 1st floor office, Garage area, BACKYARD area. The facility is licensed as a large Family Child Care Home (FCCH) with a maximum capacity of fourteen children and is operating within the licensed capacity of the license. The fire clearance for a large family childcare was approved on 01/26/2021 by Moreno Valley Fire Department.
During the inspection, LPA observed Licensee to be responsive and aware of where the children were at all times, Licensee Lobos was responsive to children and even set up a learning environment and todays subject was reptiles. This LPA was able to observe licensee Lobos, annunciating, and practicing words with the children in care. A working cell phone is available, and the current phone number on file is correct. A fully charged fire extinguisher (2A:10BC) was observed, along with a functioning smoke detector and carbon monoxide detector, both of which were tested by the Licensee. The fireplace is properly screened to prevent access by children, and all hazardous items, including toxins, are stored securely and are inaccessible to children. No weapons are present, and the Licensee Lobos, understands that all firearms, weapons, and ammunition must be locked separately and made inaccessible as per Title 22 Regulations. Stairs are barricaded with a baby gate when children are in care.
The facility provides clean, safe, and age-appropriate toys for children. A current roster is on file, and required postings, including the Facility Sketch, Emergency Disaster Plan, and Notification of Parent’s Rights, are displayed. Fire and disaster drill documentation is maintained, with the last drill conducted on May 16, 2025.
|