32 | ED and MD contacted the generator company immediately and were scheduled for a troubleshoot appointment. On 7/21/26 the generator company Generac Industrial Power conducted their visit, tests were ran and recommendations were explained on what was needed to maintain the generators working conditions.
Based on LPA's observations and interviews, and record review, the preponderance of evidence standard has been met, therefore the above allegation is found to be SUBSTANTIATED. California Code of Regulations, (Title 22, Division 6 Chapter 8), are being cited on the attached LIC 9099D.
An exit interview was conducted where this report LIC9099, LIC9099C, LIC9099D, and Appeal Rights were discussed and provided to Executive Director Cristina Ceballos at the conclusion of the visit
|